Inspection Focus Parameters
- 01Cracking, joint movement and surface loss
- 02Alignment, bulging and displacement indicators
- 03Drainage outlets, staining and erosion
- 04Toe, crest and adjacent ground condition
Target Deliverables
- 01Referenced condition baseline
- 02Defect and drainage observations
- 03Repeatable monitoring locations
- 04Escalation recommendations for engineering review
Record the structure and its setting
Wall form, materials, height, retained ground and drainage context belong in the baseline. Without them, later image comparisons can show change but not explain its significance.
Key Considerations
- Identify wall type and extents
- Capture crest, face, toe and surroundings
- Record drainage and erosion observations
Make monitoring repeatable
Where movement is a concern, future comparison needs consistent control, viewpoints and measurement expectations. A repeatable capture plan is more useful than an isolated set of photographs.
Key Considerations
- Reference defect locations consistently
- Set repeat viewpoints or survey control
- Define triggers for engineering assessment
Referenced Capabilities
Parent service lines applicable to the methodologies and deliverables outlined in this guide.
Plan a retaining wall inspection
Share the asset type, the decision the inspection needs to support, and any known access constraints. The technical team will define an appropriate scope.
Request Scope Discussion